subject
Mathematics, 22.02.2021 23:00 zach6024

A system has two components, Component 1 and Component 2, with reliabilities of 0.7 and 0.85 respectively. In order for the system to work, both components have to work. Component 1 has a switch and the switch needs to function in order for Component 1 to work. The switch has a reliability of 0.9. In addition, Component 2 is connected to a backup component, Component 3, with a reliability of 0.84. What is the reliability of the whole system

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Plz me plz i will give a brain just plz
Answers: 1
question
Mathematics, 22.06.2019 01:50
Quadrilateral ghij has coordinates g(5, 1), h(4, -3), i(6, -1), and j(2, 1). if the quadrilateral is reflected over the line y = x, what are the coordinates of h'?
Answers: 1
question
Mathematics, 22.06.2019 03:10
Factor 15x^3 - 5x^2 +6x-2 by grouping. what is the resulting expression
Answers: 3
question
Mathematics, 22.06.2019 03:30
The area of a square floor on a scale drawing is 64 square centimeters, and the scale drawing is 1 centimeter: 3 ft. what is the area of the actual floor? what is the ratio of the area in the drawing to the actual area? the area of the actual floor is square feet. the ratio of the area in the drawing to the actual area is 1 square centimeter: square feet.
Answers: 3
You know the right answer?
A system has two components, Component 1 and Component 2, with reliabilities of 0.7 and 0.85 respect...
Questions
question
Computers and Technology, 05.10.2019 22:00
question
Mathematics, 05.10.2019 22:00
question
English, 05.10.2019 22:00
question
Computers and Technology, 05.10.2019 22:00
Questions on the website: 13722362