Mathematics, 24.02.2021 01:00 nickames202otpo7q
A construction crew needs to pave a road that is 201 miles long. The crew paves 8 miles of
the road each day. The length, L (in miles), that is left to be paved after d days is given by the
following function.
L(d) = 201 - 8d
If 129 miles of the road is left to be paved, how many days has the crew been paving the
road?
Answers: 1
Mathematics, 21.06.2019 15:00
An advertising firm has an old computer that can prepare a whole mailing in 6 hours. with the of newer model the job is complete in 2 hours. how long would it take the newer model to do the job alone?
Answers: 1
Mathematics, 21.06.2019 20:10
Over which interval is the graph of f(x) = x2 + 5x + 6 increasing?
Answers: 1
A construction crew needs to pave a road that is 201 miles long. The crew paves 8 miles of
the road...
SAT, 04.01.2021 20:00
Mathematics, 04.01.2021 20:00
Mathematics, 04.01.2021 20:00
Advanced Placement (AP), 04.01.2021 20:00