subject
Mathematics, 28.02.2021 16:50 jamya62

Pizazz manufactures a 5.0 oz. energy drink of the same name. Because the cans are so small, consumers are concerned that they are not receiving the full 5 ounces in each can. A quality engineer at the company is charged with analyzing the filling process and ensuring accurate readings. On 15 different occasions over the past month, she has taken a sample of 6 energy drinks off the production line and recorded their weight. The sum of the sample means is 80.20 ounces and the sum of the sample ranges is 12.68 ounces (Hint: You are already given the sum. You just have to find the x-double bar and R-bar). Determine the control limits of an x-bar and R-chart. What is your conclusion?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Part a : solve -vp + 40 < 65 for v part b : solve 7w - 3r = 15 for r show your work .
Answers: 3
question
Mathematics, 21.06.2019 19:00
Acompany manufactures large valves, packed in boxes. a shipment consists of 1500 valves packed in 75 boxes. each box has the outer dimensions 1.2 x 0.8 x 1.6 m and the inner dimensions 1.19 x 0.79 x 1.59 m. the boxes are loaded on a vehicle (truck + trailer). the available capacity in the vehicle combination is 140 m3. each valve has a volume of 0.06 m3. - calculate the load factor on the box level (%). - calculate the load factor on the vehicle level (%). - calculate the overall load factor (%).
Answers: 1
question
Mathematics, 21.06.2019 19:10
What is the anwers for 9+2x=5x-3-x
Answers: 2
question
Mathematics, 21.06.2019 20:40
Answer pls man im trying to get out of summer school
Answers: 1
You know the right answer?
Pizazz manufactures a 5.0 oz. energy drink of the same name. Because the cans are so small, consumer...
Questions
question
Mathematics, 20.03.2021 08:00
question
Mathematics, 20.03.2021 08:00
question
Mathematics, 20.03.2021 08:00
Questions on the website: 13722367