El ingeniero Luna desea construir un edificio con la ayuda de 20 albañiles en un lapso de 320 días. Si al dueño del edificio le urge que sea en el menor tiempo posible, ¿cuántos albañiles tendrá que contratar el ingeniero Luna para terminarlo en 200 días?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Measures of the angle of r, 31 s (x+4) t (3x+9)
Answers: 1
question
Mathematics, 21.06.2019 18:30
What is coefficient of the term of degree of degree 5 in the polynomial below
Answers: 1
question
Mathematics, 21.06.2019 23:30
Find the measure of angle y. round your answer to the nearest hundredth. ( type the numerical answer only) a right triangle is shown with one leg measuring 5 and another leg measuring 14. an angle across from the leg measuring 5 is marked y degrees. numerical answers expected!
Answers: 1
question
Mathematics, 22.06.2019 02:30
If angle ase measures 168 degrees, find the measure of angle dse. the figure mag not be drawn to scale
Answers: 1
You know the right answer?
El ingeniero Luna desea construir un edificio con la ayuda de 20 albañiles en un lapso de 320 días....
Questions
question
Mathematics, 24.03.2021 02:40
question
Mathematics, 24.03.2021 02:40
question
Mathematics, 24.03.2021 02:40
question
Mathematics, 24.03.2021 02:40
question
Mathematics, 24.03.2021 02:40
Questions on the website: 13722363