subject
Mathematics, 05.03.2021 18:10 abdullaketbi71

After the end of everyday, a production plant's maintenance crews check on the machinery and grade each item's state of repair. A particular robot arm can be given ve grades: Excellent, Good, Satisfactory, Watch, Failed. If the robot arm is tagged with a Failed grade, a crew will be sent the next day to repair it. There is about a 60% chance the crew will be successful in repairing the arm back to an Excellent condition. Otherwise, they have to try again the next day to x it. The general wear and tear of operation causes at most a single level of deterioration a day and this grade decrease happens about 25% of the time. During the day, the operators can tinker with the arm and are able to increase (if possible) the repair grade level 10% of the time. The operators cannot improve a Failed arm. Management wants to model the daily grade level of a robot arm. Required:
a. State any assumptions you need to utilize a Discrete Time Markov Chain.
b. What are the possible states of your DTMC?
c. Give the TPM.
d. Draw the TPD

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Abe is a triangle. can you use the sss postulate or the sas postulate to prove triangle abc = triangle aed? by sss only neither apply both apply by sas only
Answers: 2
question
Mathematics, 21.06.2019 17:00
Two streets intersect at a 30- degree angle. at the intersection, the are four crosswalks formed that are the same length. what type of quadrilateral is formed by the crosswalks?
Answers: 3
question
Mathematics, 21.06.2019 21:00
Abakery recorded the number of muffins and bagels it sold for a seven day period. for the data presented, what does the value of 51 summarize? a) mean of bagels b) mean of muffins c) range of bagels d) range of muffins sample # 1 2 3 4 5 6 7 muffins 61 20 32 58 62 61 56 bagels 34 45 43 42 46 72 75
Answers: 2
question
Mathematics, 21.06.2019 21:30
The owner of the plant nursery where you were tells you to fill 350 ml bottles from a 30 l from a fertilizer
Answers: 1
You know the right answer?
After the end of everyday, a production plant's maintenance crews check on the machinery and grade e...
Questions
question
History, 18.11.2020 18:50
question
Business, 18.11.2020 18:50
question
Mathematics, 18.11.2020 18:50
question
Mathematics, 18.11.2020 18:50
question
Mathematics, 18.11.2020 18:50
question
Mathematics, 18.11.2020 18:50
Questions on the website: 13722360