subject
Mathematics, 08.03.2021 20:00 sonyav732

In the hand simulation of the simple processing system, suppose that a constant setup time of 3 minutes was required once a part entered the drill press but before its service could actually begin. When a setup is going on, regard the drill press as being busy. Plot the total number of parts in system as a function of simulated time. As numerical output performance measures, report the total production (number of parts produced), the average and maximum waiting time in queue, the average and maximum total time in system, the time-average and maximum number of parts in queue, and the drill-press utilization. Redo the hand simulation and discuss the results.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:40
The krasnapolski is a top-of-the-line hotel in amsterdam, the netherlands. among their many services, they rent bicycles to guests. the bicycle checkout is open 24 hours per day 7 days per week and has 50 bicycles on hand. on average, 10 guests request a bicycle each day, arriving completely randomly at all times of the day during the spring and summer seasons. guests keep bicycles for four days on average, with a standard deviation of two days. how long does a guest on average have to wait for a bike? a. approximately 24 hours b. approximately 0.033 hours c. approximately 4 days d. approximately 47 minutes
Answers: 3
question
Mathematics, 21.06.2019 22:30
Graph the system of inequalities presented here on your own paper, then use your graph to answer the following questions: y > 2x + 3y is less than negative 3 over 2 times x minus 4part a: describe the graph of the system, including shading and the types of lines graphed. provide a description of the solution area. (6 points)part b: is the point (â’4, 6) included in the solution area for the system? justify your answer mathematically. (4 points)
Answers: 1
question
Mathematics, 22.06.2019 01:30
Norder to get a certain shade of blue paint, a mixer must have 5 parts white paint to 3 parts blue. if 4 gallons of paint must be mixed, how many gallons of white paint must be used?
Answers: 2
question
Mathematics, 22.06.2019 02:00
Estimate the time en route from majors airport (area 1) to winnsboro airport (area 2). the wind is from 340° at 12 knots and the true airspeed is 136 knots. magnetic variation is 5° east.
Answers: 2
You know the right answer?
In the hand simulation of the simple processing system, suppose that a constant setup time of 3 minu...
Questions
question
Mathematics, 26.01.2021 23:00
question
Mathematics, 26.01.2021 23:00
question
Mathematics, 26.01.2021 23:00
question
Mathematics, 26.01.2021 23:00
question
Mathematics, 26.01.2021 23:00
question
Mathematics, 26.01.2021 23:00
Questions on the website: 13722363