Mathematics, 18.03.2021 01:10 ray3699
In June, Olympic Company purchased materials costing $76,000, and incurred direct labor cost of $84,000. Overhead totaled $54,000 for the month. Information on inventories was as follows:
June 1
June 30
Materials
$6,000
$5,400
Work in process
2,000
2,500
Finished goods
5,000
3,500
Answers: 3
Mathematics, 21.06.2019 12:30
Arunning track in the shape of an oval is shown. the ends of the track form semicircles. a running track is shown. the left and right edges of the track are identical curves. the top and bottom edges of the track are straight lines. the track has width 56 m and length of one straight edge 130 m. what is the perimeter of the inside of the track? (π = 3.14) 260.00 m 347.92 m 372.00 m 435.84 m
Answers: 1
Mathematics, 21.06.2019 17:00
The center of a circle represent by the equation (x+9)^2+(y-6)^2=10^2 (-9,6), (-6,9), (6,-9) ,(9,-6)
Answers: 1
Mathematics, 21.06.2019 21:30
Taylor wants to paint his rectangular deck that is 41 feet long and 24 feet wide. a gallon of paint covers about 350 square feet. how many gallons of paint will taylor need to cover the entire deck? round your answers to two decimal places when necessary.
Answers: 1
In June, Olympic Company purchased materials costing $76,000, and incurred direct labor cost of $84,...
Mathematics, 21.10.2019 19:30
English, 21.10.2019 19:30
Computers and Technology, 21.10.2019 19:30
Mathematics, 21.10.2019 19:30
Mathematics, 21.10.2019 19:30
History, 21.10.2019 19:30
Mathematics, 21.10.2019 19:30
History, 21.10.2019 19:30