subject
Mathematics, 18.03.2021 01:10 melissa3333

Doque Power Company wants to develop a regression model to help predict its daily peak power demand. This prediction is useful in determining how much generating capacity needs to be available (or purchased from competitors) on a daily basis. The daily peak power demand is influenced primarily by the weather and the day of the week. a. Build a simple linear regression model to predict peak power demand using maximum daily temperature. What is the estimated regression equation?
b. Prepare a line chart plotting the actual peak demand data against the values predicted by this regression equation. How well does the model fit the data?
c. Interpret the R2 statistic for this model.
d. Build a multiple linear regression model to predict peak power demand using maximum daily temperature and the day of the week as independent variables. (Note: This model will have seven independent variables.) What is the estimated regression equation?
e. Prepare a line chart plotting the actual peak demand data against the values predicted by this regression equation. How well does the model fit the data?
f. Interpret the R2 statistic for this model.
g. Using the model you developed in part d, what is the estimated peak power demand Duque should expect on a Wednesday in July when the daily high temperature is forecasted to be 94 degrees?
h. Compute a 95% prediction interval for the estimate in the previous question. Explain the managerial implications of this interval for Duque.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
What are the relative frequencies to the nearest hundredth of the columns of the two-way table?
Answers: 2
question
Mathematics, 21.06.2019 20:00
What sums are equal to 6/12? choose all answers that are correct a.6/12+6/12+6/12+6/12+6/12+6/12 b.2/12+1/12+1/12+2/12 c.5/12+1/12 d.1/12+1/12+1/12+3/12 plz : )
Answers: 1
question
Mathematics, 21.06.2019 23:00
What is the length of the midsegment of a trapezoid with bases of length 15 and 25 ?
Answers: 1
question
Mathematics, 22.06.2019 00:30
Me i’m stuck on all these questions besides the two bottom ones
Answers: 2
You know the right answer?
Doque Power Company wants to develop a regression model to help predict its daily peak power demand....
Questions
question
Chemistry, 27.02.2021 05:40
question
Mathematics, 27.02.2021 05:40
question
Mathematics, 27.02.2021 05:40
Questions on the website: 13722367