subject
Mathematics, 18.03.2021 01:40 yuki430p7szcq

(a) The linear or mean intercept method is one way to estimate the average grain diameter, d. If you have several cross-sections of your sample so you can determine whether the grains are equi-axed (approximately the same length in all directions), rod or columnar shaped, or platy (like a dinner plate), you can increase the accuracy of your estimate by including a shape factor in your calculation.(i) Use the mean intercept on the schematic microstructure for a hypothetical single phase metal below, to estimate the average grain size. Don’t worry about including a shape factor. Note: Mean intercept length, where LT = measured length of the line(s) on the micrograph, P = L=LTP, number of times the line(s) intersect a grain boundary and M = the magnification of the micrograph; you may need to determine this from the scale bar.(ii) If you use more than one line and you vary the orientation of your lines will you get a better estimate of the average grain size? Explain your answer in 1-3 bullets.(b) Determine the ASTM grain size number for the schematic microstructure below.(ci) Which method did you find easier to do? Explain why in 1-3 bullets?(ii) Which method would you prefer to use if your average grain size was 0.5 μm?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Shane can shovel the driveway in 4 hours, but if his sister it would take 2 hours. how long would it take taylor to shovel the driveway alone
Answers: 1
question
Mathematics, 21.06.2019 19:30
Agarden consists of an apple tree, a pear tree, cauliflowers, and heads of cabbage. there are 40 vegetables in the garden. 24 of them are cauliflowers. what is the ratio of the number of cauliflowers to the number of heads of cabbage?
Answers: 2
question
Mathematics, 21.06.2019 20:30
Tom is the deli manager at a grocery store. he needs to schedule employee to staff the deli department for no more that 260 person-hours per week. tom has one part-time employee who works 20 person-hours per week. each full-time employee works 40 person-hours per week. write and inequality to determine n, the number of full-time employees tom may schedule, so that his employees work on more than 260 person-hours per week. graph the solution set to this inequality.
Answers: 2
question
Mathematics, 21.06.2019 22:00
Which word in the sentence below is an interrogative pronoun? who is picking us up from school? whousisfrom
Answers: 1
You know the right answer?
(a) The linear or mean intercept method is one way to estimate the average grain diameter, d. If you...
Questions
question
Mathematics, 27.09.2019 18:10
Questions on the website: 13722367