subject
Mathematics, 19.03.2021 19:30 itisonlyluis

It takes 313131 employees and \$7500$7500dollar sign, 7500 to build a car, and it takes 191919 employees and \$4300$4300dollar sign, 4300 to build a motorcycle. Genghis Motors wants to spend more than \$84000$84000dollar sign, 84000 to build cars and motorbikes using at most 706706706 employees.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Answer asap ! the shortest path from point a to point b goes through a pond. to avoid the pond, you must walk straight 34 meters along one edge of the pond, then take a 90 degree turn, and again walk straight 41 meters along another edge of the pond to reach point b. about how many meters would be saved if it were possible to walk through the pond? a. 11 m b. 20 m c. 30.45 m d. 21.73 m
Answers: 1
question
Mathematics, 21.06.2019 19:30
Bob is putting books on a shelf and takes a break after filling 18 1/2 inches on the book shelf. the book shelf is now 2/3 full. how long is the entire bookshelf?
Answers: 2
question
Mathematics, 21.06.2019 20:30
Aregular pan has a length that is 4/3 the width. the total area of the pan is 432in.2. what is the width of the cake pan?
Answers: 1
question
Mathematics, 21.06.2019 22:30
Kevin's bank offered him a 4.5% interest rate for his mortgage. if he purchases 3 points, what will be his new rate?
Answers: 2
You know the right answer?
It takes 313131 employees and \$7500$7500dollar sign, 7500 to build a car, and it takes 191919 emplo...
Questions
question
Mathematics, 06.01.2021 14:00
question
English, 06.01.2021 14:00
question
Computers and Technology, 06.01.2021 14:00
question
Mathematics, 06.01.2021 14:00
question
Mathematics, 06.01.2021 14:00
question
Mathematics, 06.01.2021 14:00
Questions on the website: 13722359