subject
Mathematics, 25.03.2021 18:30 vdirectioner7634

The data below is on the number of hours 12 students studied for an econometrics test (X) and the scores they obtained (Y).
ID
Y (Scores)
X (Hrs studied)

1
6
2.
2
4
1
3
4
2
4
3
0
5
4
2.
6
7
3
7
2.
1
8
4
1
9
6
2
10
7
3
11
8
3
12
6
2
You are required to do the following:
1) Replace two of the Y values with integers between 3 and 7; and the corresponding X
values with integers between 1 and 4. Present your new data in your report. (Note: I do
not expect two students to have the same data set)!
2) Calculate the students' average score and average number of hours studied.
3) Calculate the standard deviation of X and Y.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:20
Acredit card advertises an annual interest rate of 23%. what is the equivalent monthly interest rate?
Answers: 1
question
Mathematics, 21.06.2019 18:30
(05.08a)triangle abc is transformed to similar triangle a′b′c′ below: a coordinate plane is shown. triangle abc has vertices a at 2 comma 6, b at 2 comma 4, and c at 4 comma 4. triangle a prime b prime c prime has vertices a prime at 1 comma 3, b prime at 1 comma 2, and c prime at 2 comma 2. what is the scale factor of dilation? 1 over 2 1 over 3 1 over 4 1 over 5
Answers: 3
question
Mathematics, 21.06.2019 20:00
The rectangle shown has a perimeter of 108 cm and the given area. its length is 6 more than five times its width. write and solve a system of equations to find the dimensions of the rectangle.
Answers: 3
question
Mathematics, 21.06.2019 20:30
Two angles are complementary. the larger angle is 36 more than the smaller angle. what is the measure of the larger angle?
Answers: 2
You know the right answer?
The data below is on the number of hours 12 students studied for an econometrics test (X) and the s...
Questions
question
Mathematics, 20.10.2020 03:01
question
Physics, 20.10.2020 03:01
question
Mathematics, 20.10.2020 03:01
question
Mathematics, 20.10.2020 03:01
Questions on the website: 13722361