subject
Mathematics, 25.03.2021 21:10 aek02

The operations manager at a brewery that runs 24 hours per day wants to investigate the amount of production time lost each day (24-hour period) due to equipment failure. Historically, the population mean amount of lost time has been assumed to be 3.4 hours per day. The manager feels that due to aging equipment, the population mean is now greater than 3.4 hours per day. The manager decides to test his claim. Over the next 2 months, the sample of 30 days results in an average amount of lost time 3.92 hours per day with a sample standard deviation 1.4 hours. What would be the conclusions that we can draw for the test described above based on these sample results?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Which of the following transformations does not preserve congruence? * 5 points a. (x, y) → (y − 3, x − 3) b. (x, y) → (x + 5, y − 1) c. (x, y) → (y + 9, −x + 2) d. (x, y) → (3x + 1, 3y − 2)
Answers: 3
question
Mathematics, 21.06.2019 19:50
On a piece of paper graft y+2> -3x-3 then determine which answer matches the graph you drew
Answers: 2
question
Mathematics, 22.06.2019 00:30
Write the factored form of this trinomial 9x^2+18x-7
Answers: 3
question
Mathematics, 22.06.2019 01:30
Kelli swam upstream for some distance in a hour.she then swam downstream the same river for the same distance in only 6 minutes.if the river flows at 5km/hr, how fast can kelli swim in still water?
Answers: 3
You know the right answer?
The operations manager at a brewery that runs 24 hours per day wants to investigate the amount of pr...
Questions
question
Mathematics, 22.04.2020 00:13
Questions on the website: 13722361