subject
Mathematics, 07.04.2021 21:40 delawdermia27

A landscaper estimates that a set of plants can be installed in 6 hours by 12 workers. The landscaper wants to finish a set of plants in 4 hours. Assuming that the variables are inversely related, how many workers should the landscaper bring to the job? 8
10
14
18

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
The magnitude, m, of an earthquake is defined to be m=log l/s, where i is the intensity of the earthquake (measured by the amplitude of the seismograph wave) and s is the intensity of a โ€œstandardโ€ earthquake, which is barely detectable. what is the magnitude of an earthquake that is 1,000 times more intense than a standard earthquake? use a calculator. round your answer to the nearest tenth.
Answers: 1
question
Mathematics, 21.06.2019 20:00
The two cylinders are similar. if the ratio of their surface areas is 9/1.44 find the volume of each cylinder. round your answer to the nearest hundredth. a. small cylinder: 152.00 m3 large cylinder: 950.02 m3 b. small cylinder: 972.14 m3 large cylinder: 12,924.24 m3 c. small cylinder: 851.22 m3 large cylinder: 13,300.25 m3 d. small cylinder: 682.95 m3 large cylinder: 13,539.68 m3
Answers: 2
question
Mathematics, 21.06.2019 22:40
Find the missing factor. write your answer inexponential form.9^2=9^4ร—
Answers: 1
question
Mathematics, 21.06.2019 23:30
The perimeter of an equilateral triangle is 4 cm more than the perimeter of a square and the length of a side of the triangle is 8 cm more than the length of a side of the aware. find the length of a side of the equilateral triangle
Answers: 1
You know the right answer?
A landscaper estimates that a set of plants can be installed in 6 hours by 12 workers. The landscape...
Questions
question
Computers and Technology, 01.09.2020 02:01
Questions on the website: 13722367