subject
Mathematics, 12.04.2021 14:00 kaliyaht01

QOLJTIUNI WO a) Kent single-channel waiting line has a mean arrival rate of 4 trucks per hour and the mean service rate for a 2-man crew is 5 trucks per hour.
Determine the:
i)
Probability the dock crew will be idle.
ii) Probability that 3 trucks will arrive.
iii) Probability that a truck will take less than 6 minutes for service.
iv) Average number of trucks in the system.
v) Average time a truck spends in the system.
vi)
Average number of trucks in the queue.
vii) Probability an arriving truck will have to wait.
(7 marks)
b) TP​

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Missy took the act and was told her standard score (z-score) is –1. frank took the sat and was told his standard score (z-score) is –2. which student has a better chance of getting admitted to college based on their test score?
Answers: 1
question
Mathematics, 21.06.2019 17:40
Find the value of ax 4 ; a = 2, x = 1. select one: a. 2 b. 4 c. 1 d. 8
Answers: 2
question
Mathematics, 21.06.2019 18:30
What can each term of the equation be multiplied by to eliminate the fractions before solving? x – + 2x = + x 2 6 10 12
Answers: 1
question
Mathematics, 21.06.2019 20:30
Find the area of the triangle formed by the origin and the points of intersection of parabolas y=−3x^2+20 and y=x^2−16.
Answers: 3
You know the right answer?
QOLJTIUNI WO a) Kent single-channel waiting line has a mean arrival rate of 4 trucks per hour and t...
Questions
question
Mathematics, 26.11.2020 23:40
question
Geography, 26.11.2020 23:50
question
Mathematics, 26.11.2020 23:50
question
Mathematics, 26.11.2020 23:50
Questions on the website: 13722359