Mathematics, 14.04.2021 20:30 crystalclear99

Raymond just got done jumping at Super Bounce Trampoline Center. The total cost of his session was \$43.25$43.25dollar sign, 43, point, 25. He had to pay a \$7$7dollar sign, 7 entrance fee and \$1.25$1.25dollar sign, 1, point, 25 for every minute he was on the trampoline. Write an equation to determine the number of minutes (t)(t)left parenthesis, t, right parenthesis that Raymond was on the trampoline.
Find the number of minutes he was on the trampoline.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
An airport in death valley is 60 feet below sea level, and an airplane is flying 2,000 feet above sea level. how many feet must the plane descend in order to land? a. 2060 b. 2000 feet c. 1940 feet d. 1880 feet e.1400 feet will mark as brainliest
Answers: 2
question
Mathematics, 21.06.2019 18:30
Sasha drank 8 bottles of water everyday for a week. how many bottles of water did she drink in total?
Answers: 2
question
Mathematics, 21.06.2019 18:30
At the olympic games, many events have several rounds of competition. one of these events is the men's 100-meter backstroke. the upper dot plot shows the times (in seconds) of the top 8 finishers in the final round of the 2012 olympics. the lower dot plot shows the times of the same 8 swimmers, but in the semifinal round. which pieces of information can be gathered from these dot plots? (remember that lower swim times are faster.) choose all answers that apply: a: the swimmers had faster times on average in the final round. b: the times in the final round vary noticeably more than the times in the semifinal round. c: none of the above.
Answers: 2
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
Raymond just got done jumping at Super Bounce Trampoline Center. The total cost of his session was \...
Questions
question
Mathematics, 08.11.2019 21:31
Questions on the website: 13722362