subject
Mathematics, 15.04.2021 22:00 daveankatie1671

Smith Engineering is in the process of reviewing the salaries of their surveyors. During this​ review, the company found that an experienced surveyor can survey a roadbed in 6 hours. An apprentice surveyor needs 8 hours to survey the same stretch of road. If the two work​ together, find how long it takes them to complete the job.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Iwill make brain if you me correctly fill this out needs due today pls and send it back to me (click the link and you will get it)
Answers: 2
question
Mathematics, 21.06.2019 18:30
Need an artist designed a badge for a school club. figure abcd on the coordinate grid below shows the shape of the badge: the badge is enlarged and plotted on the coordinate grid as figure jklm with point j located at (2, -2) and point m is located at (5, 4). which of these could be the coordinates for point l? a. (2, 4) b. (8, 4) c. (5, 1) d. (5, 7)
Answers: 2
question
Mathematics, 21.06.2019 19:00
Abacteria population is tripling every hour. by what factor does the population change in 1/2 hour? select all that apply
Answers: 1
question
Mathematics, 21.06.2019 20:00
The art class is planning to paint a mural on an outside wall. this figure is a scale drawing of the wall. width: 11 in length: 28 in unit rate: 1.5 ft per in. write the ratio of the area of the drawing to the area of the actual mural. write your answer as a unit rate. show that this unit rate is equal to the square of the unit rate 1.5 ft per in
Answers: 1
You know the right answer?
Smith Engineering is in the process of reviewing the salaries of their surveyors. During this​ revie...
Questions
question
Physics, 18.03.2021 01:50
question
Mathematics, 18.03.2021 01:50
question
Mathematics, 18.03.2021 01:50
question
Mathematics, 18.03.2021 01:50
Questions on the website: 13722362