subject
Mathematics, 16.04.2021 03:30 tahtahtw4887

Two methods, A and B, are available for teaching a certain industrial skill. The failure rate is 30% for method A and 10% for method B. Method B is more expensive, however, and hence is used only 20% of the time. (Method A is used the other 80% of the time.) A worker is taught the skill by one of the two methods, but he fails to learn it correctly. What is the probability that he was taught by using method A

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Monica build a remote control toy airplane for science project to test the plane she launched it from the top of a building the plane travel a horizontal distance of 50 feet before landing on the ground a quadratic function which models the height of the plane in feet relative to the ground at a horizontal distance of x feet from the building is shown
Answers: 1
question
Mathematics, 21.06.2019 20:00
Given ab and cb are tangents of p, and m =10°. what is the measure of abp?
Answers: 3
question
Mathematics, 22.06.2019 00:10
2,10,-50 next two numbers geometric sequence
Answers: 1
question
Mathematics, 22.06.2019 00:30
The scatter plot shows the number of animal cells clara examined in a laboratory in different months: plot ordered pairs 1, 20 and 2, 60 and 3,100 and 4, 140 and 5, 180 what is the approximate predicted number of animal cells clara examined in the 9th month?
Answers: 3
You know the right answer?
Two methods, A and B, are available for teaching a certain industrial skill. The failure rate is 30%...
Questions
question
English, 30.10.2019 22:31
question
Computers and Technology, 30.10.2019 22:31
Questions on the website: 13722360