subject
Mathematics, 16.04.2021 18:00 MiaZo5869

If 100 workers can do a piece of work in 53 days, then 25 workers will complete the same work in how many days?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
On the first of each month, shelly runs a 5k race. she keeps track of her times to track her progress. her time in minutes is recorded in the table: jan 40.55 july 35.38 feb 41.51 aug 37.48 mar 42.01 sept 40.87 apr 38.76 oct 48.32 may 36.32 nov 41.59 june 34.28 dec 42.71 determine the difference between the mean of the data, including the outlier and excluding the outlier. round to the hundredths place. 39.98 39.22 0.76 1.21
Answers: 1
question
Mathematics, 21.06.2019 17:30
How do you use the elimination method for this question? explain, because i really want to understand!
Answers: 1
question
Mathematics, 21.06.2019 18:00
Aman is 6 feet 3 inches tall. the top of his shadow touches a fire hydrant that is 13 feet 6 inches away. what is the angle of elevation from the base of the fire hydrant to the top of the man's head?
Answers: 1
question
Mathematics, 21.06.2019 18:20
Alana has 12.5 cups of flour with which she is baking four loaves of raisin bread and one large pretzel. the pretzel requires 2.5 cups of flour to make. how much flour is in each loaf of raisin bread? explain the steps to follow to get the answer.
Answers: 3
You know the right answer?
If 100 workers can do a piece of work in 53 days, then 25 workers will complete the same work in how...
Questions
question
English, 18.11.2019 20:31
Questions on the website: 13722362