If it takes 4 men 6 hours to repair a road, how long will it take 7 men to do the job if they work at the same rate ?

a)
2 5/7 hours

b)
3 2/7 hours

c)
3 3/7 hours

d)
3 5/7 hours

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Aright triangle has an area of 18 square inches. b: if the triangle is not an isosceles triangle, what are all the possible lengths of the legs, if the lengths are whole numbers. answer !
Answers: 1
question
Mathematics, 21.06.2019 19:00
Which values of p and q result in an equation with exactly one solution? px-43=-42x+q choose all answers that apply: a) p=-43 and q=-43 b) p=42 and q=43 c) p=43 and q=−42 d) p=42 and q=42
Answers: 1
question
Mathematics, 21.06.2019 21:30
A(1,1) b(-3,0) c(-4,-1) d(3,-2) drag it to correct position
Answers: 2
question
Mathematics, 21.06.2019 23:00
The length of an intercepted arc of a central angle of a circle is 4 cm. if the radius of the circle is 5 cm what is the measurement of the central angle to the nearest whole degree
Answers: 2
You know the right answer?
If it takes 4 men 6 hours to repair a road, how long will it take 7 men to do the job if they work a...
Questions
question
Chemistry, 15.10.2019 11:50
Questions on the website: 13722363