subject
Mathematics, 15.10.2019 19:00 erikpaynee8622

Write the equations for 74,25a n d 49

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:20
Read the situations in the table below. then drag a graph and equation to represent each situation. indicate whether each of the relationships is proportional or non-proportional. edit : i got the right answer its attached
Answers: 2
question
Mathematics, 21.06.2019 19:50
Prove (a) cosh2(x) βˆ’ sinh2(x) = 1 and (b) 1 βˆ’ tanh 2(x) = sech 2(x). solution (a) cosh2(x) βˆ’ sinh2(x) = ex + eβˆ’x 2 2 βˆ’ 2 = e2x + 2 + eβˆ’2x 4 βˆ’ = 4 = . (b) we start with the identity proved in part (a): cosh2(x) βˆ’ sinh2(x) = 1. if we divide both sides by cosh2(x), we get 1 βˆ’ sinh2(x) cosh2(x) = 1 or 1 βˆ’ tanh 2(x) = .
Answers: 3
question
Mathematics, 21.06.2019 21:00
Deepak plotted these points on the number line. point a: –0.3 point b: – 3 4 point c: – 11 4 point d: –0.7 which point did he plot incorrectly?
Answers: 2
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
Write the equations for 74,25a n d 49...
Questions
question
Mathematics, 01.04.2020 18:50
question
English, 01.04.2020 18:50
Questions on the website: 13722367