subject
Mathematics, 30.01.2020 02:42 vale2652

At roberto’s construction site, the crew can frame a wall in 35 minutes and frame the opening for a door in 21 minutes. the crew needs 9 loads of materials for each wall and 13 loads of materials for each door. one day the crew worked for 595 minutes. and used 267 loads of materials. which system of equations could be used to find the number of doors. d. and walls. w, they framed?
a 35w + 9w = 595 35d + 13d = 267
b 21w + 35d = 595 9w+ 13d= 267
c 35w + 21d = 595 13w+ 9d = 267
d 35w + 21d = 595 9w+ 13d= 267

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
An optical inspection system is used to distinguish among different part types. the probability of a correct classification of any part is 0.92. suppose that three parts are inspected and that the classifications are independent. let the random variable x denote the number of parts that are correctly classified. determine the probability mass function of x. round your answers to four decimal places (e.g. 98.7654). x f(x) 0 1 2 3
Answers: 2
question
Mathematics, 21.06.2019 21:30
Look at triangle wxy what is the length (in centimeters) of the side wy of the triangle?
Answers: 2
question
Mathematics, 21.06.2019 21:50
What function has a range {yly< 5}? question on picture above^
Answers: 3
question
Mathematics, 21.06.2019 22:00
I’m still confused on how to work the percentages
Answers: 2
You know the right answer?
At roberto’s construction site, the crew can frame a wall in 35 minutes and frame the opening for a...
Questions
question
Social Studies, 18.08.2019 18:00
question
Social Studies, 18.08.2019 18:00
Questions on the website: 13722363