at roberto’s construction site, the crew can frame a wall in 35 minutes and frame the opening for a door in 21 minutes. the crew needs 9 loads of materials for each wall and 13 loads of materials for each door. one day the crew worked for 595 minutes. and used 267 loads of materials. which system of equations could be used to find the number of doors. d. and walls. w, they framed?
a 35w + 9w = 595 35d + 13d = 267
b 21w + 35d = 595 9w+ 13d= 267
c 35w + 21d = 595 13w+ 9d = 267
d 35w + 21d = 595 9w+ 13d= 267

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Brent wants to know what is 5 x 1/2
Answers: 2
question
Mathematics, 21.06.2019 19:00
John used linear combination to solve the system of equations shown. he did so by multiplying the first equation by -3 and the second equation by another number to eliminate the x-terms. what number did jonas multiply the second equation by? 4x-6y=23x+5y=11
Answers: 2
question
Mathematics, 21.06.2019 21:30
A(1,1) b(-3,0) c(-4,-1) d(3,-2) drag it to correct position
Answers: 2
question
Mathematics, 21.06.2019 22:30
Solve: 25 points find the fifth term of an increasing geometric progression if the first term is equal to 7−3 √5 and each term (starting with the second) is equal to the difference of the term following it and the term preceding it.
Answers: 1
You know the right answer?
at roberto’s construction site, the crew can frame a wall in 35 minutes and frame the opening for a...
Questions
question
Mathematics, 07.05.2020 04:58
question
History, 07.05.2020 04:58
question
Mathematics, 07.05.2020 04:58
Questions on the website: 13722359