subject
Mathematics, 07.10.2019 22:00 ramberson101

Two bricklayers, sam and joe, are working on your house. sam can complete the work in 5 hours, while joe can complete the work in 3 hours. how many hours does the bricklaying take if they work together?

a. 15/8
b. 15/9
c. 6/8
d. 4/3

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
The equation respenting the left table is
Answers: 2
question
Mathematics, 21.06.2019 23:30
Is the underlined participial phrase correctly placed or misplaced? i smelled each and every flower strolling through the garden. a. correctly placed participial phrase b. misplaced participial phrase
Answers: 2
question
Mathematics, 22.06.2019 00:00
Tony is charged $ 50 and additional $0.15 per miles for renting a car. a) represent the cost of renting a car with an equation,and the determine the cost if he drove it70 miles.b) what would be the cost of a car rental if the car was driven 250 miles? show work
Answers: 1
question
Mathematics, 22.06.2019 00:30
(i really need ) read the story problem, and then answer the questions that follow. gordon works for a graphic design firm and is creating a label for a food truck vendor. the vendor specializes in finger food and wants to sell food in right conical containers so that they are easy for people to hold. to complete his label, gordon needs to collect several different measurements to ensure that the label he designs will fit the surface of the container. gordon has been told that the containers have a diameter of 4 inches and a height of 6 inches. part a: find the slant height of the cone. the slant height is the distance from the apex, or tip, to the base along the coneโ€™s lateral surface. show your work. part b: find the measure of the angle formed between the base of the cone and a line segment that represents the slant height. part c: imagine two line segments where each represents a slant height of the cone. the segments are on opposite sides of the cone and meet at the apex. find the measurement of the angle formed between the line segments.
Answers: 1
You know the right answer?
Two bricklayers, sam and joe, are working on your house. sam can complete the work in 5 hours, while...
Questions
question
Mathematics, 27.01.2021 18:30
question
Health, 27.01.2021 18:30
question
Chemistry, 27.01.2021 18:30
question
Mathematics, 27.01.2021 18:30
question
Physics, 27.01.2021 18:30
Questions on the website: 13722362