subject
Mathematics, 21.09.2019 17:30 gizmo50245

Two teams of workers were scheduled to produce 680 parts in a month. the first team produced 20% more parts than planned and the second team produced 15% more than planned. the two teams together produced 118 parts more than planned. how many parts was each team supposed to produce according to the plan?
max points up for grabs

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:50
The first side of a triangle measures 5 in less than the second side, the third side is 3 in more than the first side, and the perimeter is 17 in. how long is the third side? if s represents the length of the second side, which of the following represents the length of the third side? s-5 ws-2 s+ 3 next question ask for turn it in
Answers: 1
question
Mathematics, 21.06.2019 23:00
Which point has an coordinates of (2,0) ? a
Answers: 1
question
Mathematics, 21.06.2019 23:30
I'm a polygon i have no parallel lines i am formed 3 line segments i have one right angle two of my angles are angles what am i
Answers: 1
question
Mathematics, 21.06.2019 23:30
Find measure angle 1 and measure angle 3 in the kite the diagram is not drawn on the scale
Answers: 1
You know the right answer?
Two teams of workers were scheduled to produce 680 parts in a month. the first team produced 20% mor...
Questions
question
Mathematics, 11.10.2020 18:01
question
Mathematics, 11.10.2020 18:01
question
Mathematics, 11.10.2020 18:01
question
Spanish, 11.10.2020 18:01
question
Mathematics, 11.10.2020 18:01
question
Mathematics, 11.10.2020 18:01
question
Mathematics, 11.10.2020 18:01
Questions on the website: 13722363