During 2013, tanner manufacturing expected job no. 26 to cost $300,000 of overhead, $500,000 of materials, and $200,000 in labor. tanner applied overhead based on direct labor cost. actual production required an overhead cost of $280,000, $550,000 in materials used, and $210,000 in labor. all of the goods were completed. what amount was transferred to finished goods?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Which point is on the line y=-2+3? (-2,-1) (3,3) (3,-3) (-3,-9)
Answers: 2
question
Mathematics, 21.06.2019 20:10
In the diagram, the ratios of two pairs of corresponding sides are equal to prove that almn - axyz by the sas similarity theorem, it also needs to be shown that x 6 z un z zz un = 2x zləzz lezy
Answers: 1
question
Mathematics, 21.06.2019 21:00
In the field of thermodynamics, rankine is the unit used to measure temperature. one can convert temperature from celsius into rankine using the formula , what is the temperature in celsius corresponding to r degrees rankine? a. 9/5(c - 273) b. 9/5(c + 273) c. 5/9( c - 273) d. 5/9( c + 273)
Answers: 1
question
Mathematics, 21.06.2019 22:00
Rick is driving to his uncles house in greenville,which is 120 miles from ricks town .after covering x miles rick she's a sign stating that greensville is 20 miles away. which equation when solved will give the value of x. a: x+120 = 20 b: x x120 =20 c: x +20 equals 120 d: x x20= 120
Answers: 3
You know the right answer?
During 2013, tanner manufacturing expected job no. 26 to cost $300,000 of overhead, $500,000 of mate...
Questions
question
English, 20.10.2020 21:01
question
History, 20.10.2020 21:01
question
Mathematics, 20.10.2020 21:01
question
Mathematics, 20.10.2020 21:01
question
Advanced Placement (AP), 20.10.2020 21:01
question
Chemistry, 20.10.2020 21:01
question
Chemistry, 20.10.2020 21:01
question
Mathematics, 20.10.2020 21:01
Questions on the website: 13722359