subject
Mathematics, 31.01.2020 14:51 Tyrant4life

Consider an assembly line with 20 stations. each station has a 0.5% probability of making a defect. at the end of the line, an inspection step singles out the defective units. the inspection step catches 80% of all defects. from inspection, units that are deemed to be non-defective are moved to the shipping department. if a defect is found at inspection, it is sent to the rework department. rework fixes about 95% of the defective units. units are directly shipped from the rework department with no further inspection taking place. what is the probability that a unit ends up in rework (in decimal form)?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Drag the tiles to the correct boxes to complete the pairs. not all tiles will be used. the heights of the girls in an advanced swimming course are 55, 60, 59, 52, 65, 66, 62, and 65 inches. match the measures of this data with their values.
Answers: 1
question
Mathematics, 21.06.2019 16:30
Quadrilateral ghjk has vertices g(2, 3), h(8, 2), j(6, 8), and k(3, 6). it is transformed according to the rule t(ā€“4, ā€“5). what are the coordinates of gā€? (ā€“7, 3) (ā€“2, 2) (ā€“1, ā€“7) (2, ā€“2)
Answers: 2
question
Mathematics, 21.06.2019 19:00
The focus of parabola is (-4, -5), and its directrix is y= -1. fill in the missing terms and signs in parabolas equation in standard form
Answers: 1
question
Mathematics, 21.06.2019 19:00
Let hh represent the number of hummingbirds and ss represent the number of sunbirds that must pollinate the colony so it can survive until next year. 6h+4s > 746h+4s> 74 this year, 88 hummingbirds pollinated the colony. what is the least number of sunbirds that must pollinate the colony to ensure that it will survive until next year?
Answers: 1
You know the right answer?
Consider an assembly line with 20 stations. each station has a 0.5% probability of making a defect....
Questions
question
History, 21.09.2020 06:01
Questions on the website: 13722359