subject
Mathematics, 29.08.2019 17:30 floihqrrigweo

The length of time to complete a door assembly on an automobile factory assembly line is normally distributed with a mean of 6.7 minutes and a standard deviation of 2.2 minutes. for a door selected at random, what is the probability the assembly time will be:
a.5 minutes or less?
b.10 minutes or more?
c. between 5 and 10 minutes?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Write two subtraction equations that are equivalent to 5 + 12 = 17.
Answers: 2
question
Mathematics, 21.06.2019 16:40
Which data set has a greater spread? why? set a: {38, 12, 23, 48, 55, 16, 18} set b: {44, 13, 24, 12, 56} has a greater spread because .
Answers: 2
question
Mathematics, 21.06.2019 17:30
Select the sequences that are geometric.
Answers: 2
question
Mathematics, 21.06.2019 20:00
The boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a) e = 2b - 212 b) b = 2e - 212 c) e = -2b + 212 d) b = -2e + 212
Answers: 1
You know the right answer?
The length of time to complete a door assembly on an automobile factory assembly line is normally di...
Questions
question
Mathematics, 28.05.2020 21:06
question
Mathematics, 28.05.2020 21:06
Questions on the website: 13722360