subject
Mathematics, 21.04.2021 18:30 Angel1107

The tables show the functions to calculate the costs for a master plumber, M(h), and an apprentice, A(h),
depending on the number of hours, h, that it takes to
complete a job.
The total cost for work done by a crew of one master
plumber and one apprentice is the sum of the costs for
each member of the crew.
Which table shows the total cost for various times
orlad
2.75
325
A5


The tables show the functions to calculate the costs for a

master plumber, M(h), and an apprentic

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Perform the indicated operation. 8/a - 6/a + 7/a
Answers: 1
question
Mathematics, 21.06.2019 17:00
Somone me i want to know what 18 hours out of 24 hours in a fraction
Answers: 1
question
Mathematics, 21.06.2019 18:50
What are the values of a, b, and c in the quadratic equation 0 = x2 – 3x - 2? a = 1, b = 3, c = 2 a=, b = -3,c=-2 a = 1, b = 3, c= 2 a = 1.0= -3, c = 2
Answers: 2
question
Mathematics, 21.06.2019 21:30
The perimeter of a rectangular lot of land is 436 ft. this includes an easement of x feet of uniform width inside the lot on which no building can be done. if the buildable area is 122 ft by 60 ft, determine the width of the easement. select one: a. 9 feet b. 18 feet c. 4.5 feet d. 7 feet
Answers: 3
You know the right answer?
The tables show the functions to calculate the costs for a master plumber, M(h), and an apprentice...
Questions
question
Mathematics, 27.11.2019 08:31
question
Mathematics, 27.11.2019 08:31
Questions on the website: 13722362