The following information is available for the production of utils:
STANDARDS
Ingredients Pounds Price per pound Total
A 400 $2 $800
B 800 4 3,200
C 800 6 4,800
Input 2,000
Output 1,500
ACTUAL RESULTS
Ingredients Pounds Price per pound
A 50,000 $2.10
B 60,000 3.95
C 90,000 7.00
Input 200,000
Output 120,000
REQUIRED: Calculate the yield variance.
Answers: 2
Mathematics, 21.06.2019 18:00
The base of a triangle exceeds the height by 7 centimeters. if the area is 400 square centimeters, find the length of the base and the height of the triangle.
Answers: 1
Mathematics, 21.06.2019 18:30
Astick 2 m long is placed vertically at point b. the top of the stick is in line with the top of a tree as seen from point a, which is 3 m from the stick and 30 m from the tree. how tall is the tree?
Answers: 2
Mathematics, 21.06.2019 19:30
Ariel is working at a meat packing plant for 5 nights a week. her regular wage is $11 an hour. she earns tine and a half for any overtime hours. this week she worked 9 hours of over time .how much will ariel earn for overtime this week ?
Answers: 1
Mathematics, 21.06.2019 20:30
Solve each quadratic equation by factoring and using the zero product property. [tex]x^2+6x+8=0[/tex]
Answers: 2
The following information is available for the production of utils:
STANDARDS
Ingredie...
Ingredie...
Mathematics, 04.04.2020 00:01
Mathematics, 04.04.2020 00:01
Mathematics, 04.04.2020 00:01
Chemistry, 04.04.2020 00:01
Mathematics, 04.04.2020 00:01
Mathematics, 04.04.2020 00:01