A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices and the requirements of the project, the bid from Contractor A can be described with a uniform distribution between $600,000 and $800,000, while the bid from Contractor B can be described with a normal distribution with a mean of $700,000 and standard deviation of $50,000. If the building contractor submits a bid of $750,000, what is the probability that the building contractor will obtain the bid

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
In each bouquet of flowers, there are 2 roses and 3 white carnations. complete the table to find how many roses and carnations there are in 2 bouquets of flowers.
Answers: 1
question
Mathematics, 21.06.2019 15:00
2x + 1 < 5 solve the following inequality. then place the correct number in the box provided.
Answers: 2
question
Mathematics, 21.06.2019 18:00
Factor x2 – 8x + 15. which pair of numbers has a product of ac and a sum of what is the factored form of the
Answers: 1
question
Mathematics, 21.06.2019 20:30
Apinhole camera is made out of a light-tight box with a piece of film attached to one side and pinhole on the opposite side. the optimum diameter d(in millimeters) of the pinhole can be modeled by d=1.9[ (5.5 x 10^-4) l) ] ^1/2, where l is the length of the camera box (in millimeters). what is the optimum diameter for a pinhole camera if the camera box has a length of 10 centimeters
Answers: 1
You know the right answer?
A building contractor is preparing a bid on a new construction project. Two other contractors will b...
Questions
Questions on the website: 13722361