The following data were obtained in a study taken on a horizontal milling machine: Parts produced per cycle: 8. Average measured cycle time: 8.36 minutes. Average measured stress time per cycle: 4.62 minutes. Average fast traverse time: 0.08 minutes. Average cutting time with electrical power: 3.66 minutes. Performance rating: 115%. Clearance (machine time): 10%. Slack (effort time): 15%. The operator works on the task 8 hours a day and produces 380 parts. How many standard hours does the operator work

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 23:30
Answer each of the questions for the following diagram: 1. what type of angles are these? 2. solve for x. what does x equal? 3. what is the measure of the angles?
Answers: 1
question
Mathematics, 22.06.2019 03:00
Alocal hamburger shop sold a combined total of 601 hamburgers and cheeseburgers on friday. there were 51 more cheeseburgers sold than hamburgers. how many hamburgers were sold on friday? a local hamburger shop sold a combined total of hamburgers and cheeseburgers on friday. there were more cheeseburgers sold than hamburgers. how many hamburgers were sold on friday?
Answers: 1
question
Mathematics, 22.06.2019 04:30
Molly planted vegetables in 0.6 of her garden and flowers in the rest of it. she planted green beans in 0.4 of the vegetable section of the garden. how much of her garden was planted with green beans?
Answers: 2
question
Mathematics, 22.06.2019 04:30
B. jan surveyed her friends to find their favorite season. she recorded jhi ii for summer. how many people chose summer as their favorite season?
Answers: 3
You know the right answer?
The following data were obtained in a study taken on a horizontal milling machine: Parts produced pe...
Questions
Questions on the website: 13722359