subject
Mathematics, 13.05.2021 14:50 emilyphillips1681

A factory process requires 3 steps to finish a product. The steps each have a mean completion time of u= 10 seconds and a standard deviation of o = 5 seconds. The time it takes to complete each step is
independent from the other steps. Let T be the total completion time of the 3 steps on a randomly chosen
product.
Find the mean of T.
μY T =
seconds

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Colin listed his assets and liabilities on a personal balance sheet. colin’s balance sheet (august 2013) assets liabilities cash $1,500 credit card $500 stocks $800 rent $800 car $5,000 car loan $1,200 coin collection $1,200 student loan $5,000 total total which statement is true about the total assets and the total liabilities? the total of the assets and the liabilities are the same. the total of the assets is greater than the total of the liabilities. the total of the assets is less than the total of the liabilities. the total of the assets cannot be compared to the total of the liabilities.
Answers: 2
question
Mathematics, 21.06.2019 17:00
Shane can shovel the driveway in 4 hours, but if his sister it would take 2 hours. how long would it take taylor to shovel the driveway alone
Answers: 1
question
Mathematics, 21.06.2019 20:30
Martha has a deck of cards. she has lost some of the cards, and now the deck only contains nine spades, eleven diamonds, eight clubs, and twelve hearts. martha predicts that whenever she draws a card from the deck without looking, she will draw a club one-fifth of the time. which activity would best allow martha to test her prediction? a. randomly draw a card from the box and see if it is a club. b. randomly draw a card. then, continue to draw another card until all eight clubs are drawn. c. randomly draw and replace a card 120 times. then, observe how close to 30 times a club is drawn. d. randomly draw and replace a card 100 times. then, observe how close to 20 times a club is drawn.
Answers: 1
question
Mathematics, 22.06.2019 00:30
Which of the following is the sum of 3 1/6 + 6 3/8?
Answers: 2
You know the right answer?
A factory process requires 3 steps to finish a product. The steps each have a mean completion time o...
Questions
Questions on the website: 13722360