subject
Mathematics, 15.05.2021 04:50 violet9139

Ne A chain saw requires 8 hours of assembly and a wood chipper 2 hours. A maximum of 48 hours of assembly
time is available. The profit is $150 on a chain saw and $230 on a chipper. Hové many of each should be
assembled for maximum profit?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Just tell me how to set up the equation.
Answers: 2
question
Mathematics, 21.06.2019 19:00
The liabilities of cullumber are $99,000. owner’s capital is $143,000; drawings are $96,000; revenues, $467,000; and expenses, $301,000. what is the amount of cullumber company’s total assists?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Someone answer asap for ! max recorded the heights of 500 male humans. he found that the heights were normally distributed around a mean of 177 centimeters. which statements about max’s data must be true? a. the median of max’s data is 250 b. more than half of the data points max recorded were 177 centimeters. c. a data point chosen at random is as likely to be above the mean as it is to be below the mean. d. every height within three standard deviations of the mean is equally likely to be chosen if a data point is selected at random.
Answers: 1
question
Mathematics, 21.06.2019 20:30
What is the volume of the cone to the nearest cubic millimeter? (use π  = 3.14) a) 46 mm3 b) 128 mm3 c) 183 mm3 d) 275 mm3 diameter = 5 mm height = 7 mm how do you do this problem step by step?
Answers: 1
You know the right answer?
Ne A chain saw requires 8 hours of assembly and a wood chipper 2 hours. A maximum of 48 hours of as...
Questions
question
Mathematics, 06.12.2019 06:31
question
History, 06.12.2019 06:31
question
Mathematics, 06.12.2019 06:31
Questions on the website: 13722362