subject
Mathematics, 16.05.2021 20:00 ashrobbb

A team of 5 bricklayers and 1 electrician is working at a construction site. The team finishes the job and is paid. The bricklayers receive $500 each, and the electrician
receives $100 more than the average salary of the entire team. How many dollars does
the electrician get?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Giuseppi's pizza had orders for $931.00 of pizzas. the prices were $21 for a large pizza, 514 for a medium pizza, and $7 for a small pizza. the number of large pizzas was two less than four times the number of medium pizzas. thenumber of small pizzas was three more than three times the number of medium pizzas. how many of each size of pizza were ordered?
Answers: 1
question
Mathematics, 21.06.2019 16:30
Solve the equation w^3 = 1,000 i honestly dont know how to punch this into a calculator pls
Answers: 1
question
Mathematics, 21.06.2019 20:00
He weights of 2-pound bags of best dog food are approximately normally distributed with a given mean  and standard deviation  according to the empirical rule, what percentage of the bags will have weights within 3 standard deviations of the mean? 47.5%68%95%99.7%
Answers: 3
question
Mathematics, 21.06.2019 22:20
The school track has eight lanes. each lane is 1.25 meters wide. the arc at each end of the track is 180. the distance of the home straight and the radii for the arcs in the 1st 4 lanes are given. s=85m r1=36.5m r2=37.75m r3=39m r4=40.25m part one: find the radii of lanes 5 through 8 of the track. show your work. part two: if max ran around lane one, how far did he run? show your work and explain your solution. part three: max wants to run a total of three laps around the track, choose two additional lanes (2-8) for him to run and find the distance around those two lanes. show your work and round to the hundredths. part 4: based on your lane choices in part three, what was the total distance max ran in the three laps around the track?
Answers: 2
You know the right answer?
A team of 5 bricklayers and 1 electrician is working at a construction site. The team finishes the...
Questions
question
Mathematics, 13.10.2019 15:00
question
Social Studies, 13.10.2019 15:00
question
Biology, 13.10.2019 15:00
Questions on the website: 13722361