subject
Mathematics, 18.05.2021 14:00 haydencheramie

Height of the Qutab Minaar is 73 metre. When the last stone on the top of the Qutab Minaar was carried from ground to its top by labour weighting 50 kg (bricks carried weighted 20kg), how much work was done in that job by gravitational force? (g = 10 m/s2) (d) –12770J

(a) –32110 J

(b) –51100 J

(c) –76990J

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 23:30
Petes dog weighed 30 pounds it then lost 16% of it's weight how much did pete lose
Answers: 2
question
Mathematics, 22.06.2019 00:00
The construction of copying qpr is started below. the next step is to set the width of the compass to the length of ab. how does this step ensure that a new angle will be congruent to the original angle? by using compass take the measures of angle and draw the same arc according to it.
Answers: 1
question
Mathematics, 22.06.2019 02:00
If f(x)=3 over x+2 - square root x-3 then f(7)=
Answers: 1
question
Mathematics, 22.06.2019 03:00
Explain how to convert measurements in the metric system
Answers: 1
You know the right answer?
Height of the Qutab Minaar is 73 metre. When the last stone on the top of the Qutab Minaar was carri...
Questions
question
French, 15.10.2020 20:01
question
History, 15.10.2020 20:01
question
Physics, 15.10.2020 20:01
question
History, 15.10.2020 20:01
Questions on the website: 13722367