Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 22:30
Write the equation of a line that is perpendicular to the given line and that passes through the given point. –3x – 6y = 17; (6, 3) y = x – 9 y = 2x – 9 y = –2x – 9 y = x + 0 3. is the relationship shown by the data linear? if so, model the data with an equation. x y 1 5 5 10 9 15 13 20 the relationship is linear; y – 5 = (x – 1). the relationship is not linear. the relationship is linear; y – 5 = (x – 1). the relationship is linear; y – 1 = (x – 5). write an equation in point-slope form for the line through the given point with the given slope. (–10, –1); m = y + 10 = (x + 1) y – 1 = (x – 10) y – 1 = (x + 10) y + 1 = (x + 10) 5. write an equation for each translation of . 6.5 units up y + 6.5 = | x | y = | 6.5 x | y = | x | + 6.5 y = | x | – 6.5 6. write an equation for each translation of . 5.5 units right y = | x | + 5.5 y = | x – 5.5 | y = | x | – 5.5 y = | x + 5.5 | 7. which equation translates y = | x | by 8 units to the left? y = | x | – 8 y = | x | + 8 y = | x – 8| y = | x + 8|
Answers: 1
Solve the following equation for x: 3x - 8 = 25...
Mathematics, 22.11.2021 22:10
Mathematics, 22.11.2021 22:10
Mathematics, 22.11.2021 22:10
Spanish, 22.11.2021 22:10
Mathematics, 22.11.2021 22:10