Mathematics, 27.05.2021 01:00 stevensquad638
When building a house, the number of days required to build varies inversely with
with the number of workers. One house was built in 11 days by 49 workers. How
many days would it take to build a similar house with 7 workers?
Answers: 2
Mathematics, 21.06.2019 17:30
Assume that 1400 births are randomly selected and 1378 of the births are girls. use subjective judgment to describe the number of girls as significantly high, significantly low, or neither significantly low nor significantly high. choose the correct answer below. a. the number of girls is neither significantly low nor significantly high. b. the number of girls is significantly high. c. the number of girls is significantly low. d. it is impossible to make a judgment with the given information.
Answers: 1
Mathematics, 21.06.2019 17:30
James adds two numbers a + b. sally adds the same two numbers but reverse the order b + a what property of addition assures us that james and sally will get the same sum
Answers: 2
Mathematics, 21.06.2019 18:00
The longer leg of a 30° 60° 90° triangle is 16 times square root of three how long is a shorter leg
Answers: 1
When building a house, the number of days required to build varies inversely with
with the number o...
Biology, 23.01.2020 20:31