Mathematics, 27.05.2021 15:20 sepdentalcare8774
The gates of an amusement park are closely monitored to determine whether the number of
people in the amusement park ever poses a safety hazard.
On a certain day, the rate at which people enter amusement park is modeled by the function
e(x) = 0.03x3 + 2, where the rate is measured in hundreds of people per hour since the gates
opened. The rate at which people leave the amusement park is modeled by the function
l(x) = 0.5x + 1, where the rate is measured in hundreds of people per hour since the gates
opened.
What does (e β l)(4) mean in this situation?
Answers: 1
Mathematics, 22.06.2019 03:30
The lengths of the two sides of a right triangle are 5 inches and 8 inches what is the difference the possible lengths of the third side of the triangle
Answers: 3
Mathematics, 22.06.2019 06:00
What is the order of these fractions from least to greatest 2/3 7/10 5/8 65/500
Answers: 1
Mathematics, 22.06.2019 06:00
When you divide a fraction less than 1 by a whole number greater than 1 is the quotient less than,greater than, or equal to the dividend?
Answers: 1
The gates of an amusement park are closely monitored to determine whether the number of
people in t...
Geography, 09.11.2020 20:10
History, 09.11.2020 20:10
English, 09.11.2020 20:10
Mathematics, 09.11.2020 20:10
Computers and Technology, 09.11.2020 20:10
Social Studies, 09.11.2020 20:10
Social Studies, 09.11.2020 20:10
Social Studies, 09.11.2020 20:10
Mathematics, 09.11.2020 20:10
Business, 09.11.2020 20:10