Consider the following project network applying PERT/CPM as described, where the number over each through this network from start to finish, since the longest path is node is the time required for the corresponding activity. Consider the problem of finding the longest path (the largest total time) the critical path.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:10
which  best  describes the transformation from the graph of  f(x) =  x2  to the graph of  f(x) = (x  – 3)2  – 1?   left 3 units, down 1 unitleft 3 units, up 1 unitright 3 units, down 1 unit  right 3 units, up 1 unit
Answers: 1
question
Mathematics, 21.06.2019 23:00
700 miles the train takes 5 hours to a travel the distance at what unit rate is the train traveling?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Someone answer this asap for the length, in feet, of a rectangular rug is represented by the expression 5x² + 2x. the width, in feet, is represented by the expression 3x². which expression represents the perimeter, in feet, of the rug? a. 8x² + 2x b. 8x² + 4x c. 16x² + 2x d. 16x² + 4x
Answers: 2
question
Mathematics, 22.06.2019 00:30
What is 6/10 rounded to the nearest half
Answers: 2
You know the right answer?
Consider the following project network applying PERT/CPM as described, where the number over each th...