Mathematics, 03.06.2021 16:20 jimena15

On Tuesday, you have two orders. You may send each order to a separate factory OR both to the same factory. If they are both sent to be fulfilled by a single factory, you must use the total of the two orders to find that factory’s cost per unit for production on this day. Remember that the goal is to end the day with the lowest cost per unit to produce the company’s products. Order B is 7,000 units, and Order C is 30,000 units.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
The perimeter of a movie screen is 54 meters. the screen is 18 meters wide. how tall is it?
Answers: 1
question
Mathematics, 21.06.2019 19:30
Mrs. gehrke said cheddar weighs 16.8 pounds. he actually weighs 15.2 pounds. what is the percent error?
Answers: 1
question
Mathematics, 21.06.2019 20:00
The boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a) e = 2b - 212 b) b = 2e - 212 c) e = -2b + 212 d) b = -2e + 212
Answers: 1
question
Mathematics, 22.06.2019 03:00
Which answer choice is it? is it the first ,second,third or fourth giving 40 points for whoever answers correctly you
Answers: 1
You know the right answer?
On Tuesday, you have two orders. You may send each order to a separate factory OR both to the same f...
Questions
question
Mathematics, 28.12.2019 23:31
Questions on the website: 13722363