Designing 100 pieces of a PCB, engineer's find that the batch has a M. A.D of (1.5) . A second batch with 100 pieces has a M. A.D of (0.20) Which batch has less variability and what does it mean for the production engineer's? M. A.D(Mean Absolute Deviation) ​

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
Type the correct answer in the box. consider the system of linear equations below. rewrite one of the two equations above in the form ax + by = c, where a, b, and c are constants, so that the sum of the new equation and the unchanged equation from the original system results in an equation in one variable.
Answers: 2
question
Mathematics, 22.06.2019 00:30
Three friends are comparing the prices of various packages of golf balls at a sporting goods store. hector finds a package of 6 golf balls that costs $4.50.
Answers: 3
question
Mathematics, 22.06.2019 00:30
Bo is buying a board game that usually costs bb dollars. the game is on sale, and the price has been reduced by 18\%18%. which of the following expressions could represent how much bo pays for the game? choose 2 answers: choose 2 answers: (choice a) a 0.82b0.82b (choice b) b 1.18b1.18b (choice c) c b-0.18b−0.18 (choice d) d b-18b−18 (choice e) e b-0.18bb−0.18b
Answers: 2
question
Mathematics, 22.06.2019 01:00
Suppose your sat score is 2040. a college with an average sat score for admintted students of which of these would most likely be your best option?
Answers: 1
You know the right answer?
Designing 100 pieces of a PCB, engineer's find that the batch has a M. A.D of (1.5) . A second batch...
Questions
question
Biology, 14.12.2020 21:30
question
Computers and Technology, 14.12.2020 21:30
question
Mathematics, 14.12.2020 21:30
question
Computers and Technology, 14.12.2020 21:30
Questions on the website: 13722363