Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 23:30
In the diagram, ab is tangent to c, ab = 4 inches, and ad = 2 inches. find the radius of the circle.
Answers: 1
Mathematics, 22.06.2019 00:30
Which of these side lengths could form a triangle a) 2 cm , 2 cm , 4 cm b) 3 cm , 5 cm , 10 cm c) 3 cm , 4 cm , 5 cm d) 4 cm , 8 cm , 15 cm
Answers: 3
Mathematics, 22.06.2019 02:50
The graph of f(x) shown below has the same shape as the graph of g(x)=x^3-x^2 but it is shifted to the left 2 units what is its equation
Answers: 2
Mathematics, 22.10.2020 18:01
Mathematics, 22.10.2020 18:01
Health, 22.10.2020 18:01
History, 22.10.2020 18:01
Arts, 22.10.2020 18:01
Arts, 22.10.2020 18:01
Mathematics, 22.10.2020 18:01
Mathematics, 22.10.2020 18:01
Mathematics, 22.10.2020 18:01
Mathematics, 22.10.2020 18:01
Mathematics, 22.10.2020 18:01
Business, 22.10.2020 18:01