subject
Mathematics, 08.06.2021 04:40 NetherisIsTheQueen

A company wants to select 1 project from a set of 4 possible projects. Which of the following constraints ensures that only 1 will be selected? a. X1 + X2 + X3 + X4 = 1
b. X1 + X2 + X3 + X4 = 1
c. X1 + X2 + X3 + X4= 1
d. X1 + X2 + X3+ X4= 0

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Bugs bunny was 33 meters below ground, digging his way toward pismo beach, when he realized he wanted to be above ground. he turned and dug through the dirt diagonally for 80 meters until he was above ground
Answers: 3
question
Mathematics, 21.06.2019 19:50
The probability that an adult possesses a credit card is .70. a researcher selects two adults at random. by assuming the independence, the probability that the first adult possesses a credit card and the second adult does not possess a credit card is:
Answers: 3
question
Mathematics, 21.06.2019 20:50
Write the equation in logarithmic form e^x=403.429
Answers: 1
question
Mathematics, 21.06.2019 21:00
Isabel graphed the following system of equations. 2x – y = 6 y = -3x + 4 she came up with the solution (2,-2). what were the 3 steps she did to get that solution? (make sure they are in the correct order)
Answers: 2
You know the right answer?
A company wants to select 1 project from a set of 4 possible projects. Which of the following constr...
Questions
Questions on the website: 13722361