Mathematics, 12.06.2021 14:00 sarinaneedshelp01

5 men can complete a job in 4 days. In how many days can 10 men working at 1/4 of the previous rate complete the job?​

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
Worth 100 points need the answers asap first row -x^2 2x^2 (x/2)^2 x^2 x is less than 2 x is greater than 2 x is less than or equal to 2 x is greater than or equal to 2 second row -5 -5/2 4 5 •2 is less than x& x is less than 4 •2 is less than or equal to x & x is less than or equal to 4 •2 is less than or equal to x& x is less than 4 •2 is less than x& x is less than or equal to 4
Answers: 1
question
Mathematics, 21.06.2019 23:00
Aquadrilateral has exactly 3 congruent sides davis claims that the figure must be a rectangle why is his claim incorrect.
Answers: 1
question
Mathematics, 22.06.2019 02:20
According to the general equation for conditional probability, if p(ab) = 4/5 and p(b)= 5/6, what is p(a|b)? a. 8/9 b. 35/36 c. 24/25 d. 15/16
Answers: 2
question
Mathematics, 22.06.2019 03:30
Y< 2x-3 y? mx+3 which value of m and which symbol result in the system of inequalities shown above having no solution? a) m=-2; > b) m=-1/2; < c) m=2; > d) m=2;
Answers: 3
You know the right answer?
5 men can complete a job in 4 days. In how many days can 10 men working at 1/4 of the previous rate...