subject
Mathematics, 14.06.2021 05:10 adjjones2011

Activity-Based Costing: Factory Overhead Costs The total factory overhead for Bardot Marine Company is budgeted for the year at $630,400, divided into four activities: fabrication, $308,000; assembly, $120,000; setup, $108,900; and inspection, $93,500. Bardot Marine manufactures two types of boats: speedboats and bass boats. The activity-base usage quantities for each product by each activity are as follows: Fabrication Assembly Setup Inspection Speedboat 5,500 dlh 15,000 dlh 40 setups 69 inspections Bass boat 16,500 5,000 290 481 22,000 dlh 20,000 dlh 330 setups 550 inspections Each product is budgeted for 4,000 units of production for the year. a. Determine the activity rates for each activity. Fabrication $fill in the blank 1 per direct labor hour Assembly $fill in the blank 2 per direct labor hour Setup $fill in the blank 3 per setup Inspection $fill in the blank 4 per inspection b. Determine the activity-based factory overhead per unit for each product. Round to the nearest whole dollar. Speedboat $fill in the blank 5 per unit Bass boat $fill in the blank 6 per unit

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Which statement describes surface features called maria on the moon
Answers: 3
question
Mathematics, 21.06.2019 20:20
Aline passes through (1,-5) and(-3,7) write an equation for the line in point slope form rewrite the equation in slope intercept form
Answers: 1
question
Mathematics, 21.06.2019 21:20
In 2009, there were 1570 bears in a wildlife refuge. in 2010, the population had increased to approximately 1884 bears. if this trend continues and the bear population is increasing exponentially, how many bears will there be in 2018?
Answers: 2
question
Mathematics, 21.06.2019 23:00
Is there a direction u in which the rate of change of f(x,y)equals=x squared minus 3 xy plus 4 y squaredx2−3xy+4y2 at p(1,2) equals 14? give reasons for your answer. choose the correct answer below. a. no. the given rate of change is smaller than the minimum rate of change. b. no. the given rate of change is larger than the maximum rate of change. c. yes. the given rate of change is larger than the minimum rate of change and smaller than the maximum rate of change.
Answers: 2
You know the right answer?
Activity-Based Costing: Factory Overhead Costs The total factory overhead for Bardot Marine Company...
Questions
question
Geography, 03.09.2019 00:30
Questions on the website: 13722363