A contractor's project being analyzed by PERT has an estimated time for the critical path of 120 days. The sum of all activity variances is 81; the sum of variances along the critical path is 64. (1) What is the probability that the project will take 130 or more days to complete?
(2) What is the probability that the project will take 108 or less days to complete?
(3) What is the probability that the project will be finished between 108 and 130 days?
(4) Please identify and date by which the project will be finished with a 99% probability.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Gregory draws a scale drawing of his room. the scale that he uses is 1 cm : 4 ft. on his drawing, the room is 3 centimeters long. which equation can be used to find the actual length of gregory's room?
Answers: 1
question
Mathematics, 21.06.2019 22:00
Iam at home. /: i am playing video games. translate the following statement into symbolic form.
Answers: 2
question
Mathematics, 21.06.2019 23:00
Who long does it take to drive 150 miles at 45 miles per hour
Answers: 2
question
Mathematics, 21.06.2019 23:00
Alex measured the length of an item to be 3.7 cm. the actual length is 3.5 cm. what is alex’s percent error?
Answers: 2
You know the right answer?
A contractor's project being analyzed by PERT has an estimated time for the critical path of 120 day...
Questions
question
Mathematics, 01.07.2019 20:00
question
Mathematics, 01.07.2019 20:00
question
Mathematics, 01.07.2019 20:00
Questions on the website: 13722359