A project has four activities (A, B, C, and D) that must be performed sequentially. The probability distributions for the time required to complete each of the activities are as follows. Activity Activity Time (weeks) Probability A 5 0.30 6 0.35 7 0.20 8 0.15 B 3 0.15 5 0.60 7 0.25 C 10 0.10 12 0.25 14 0.35 16 0.25 18 0.05 D 8 0.65 10 0.35 (a) Construct a spreadsheet simulation model to estimate the average length of the project (in weeks) and the standard deviation of the project length. (Use at least 1,000 trials. Round you answers to one decimal place.) average weeks standard deviation weeks (b) What is the estimated probability that the project will be completed in 35 weeks or less
Answers: 3
Mathematics, 21.06.2019 16:40
Which statement accurately explains whether a reflection over the y-axis and a 270° counterclockwise rotation would map figure acb onto itself? a coordinate plane with figure acb with point a at 1, 1, c at 3, 4 and b at 5, 1 yes, a″c″b″ is located at a″(1, 1), c″(4, 3), and b″(1, 5) yes, a″c″b′ is located at a″(1, 1), c″(3, 4), and b″(5, 1) no, a″c″b″ is located at a″(1, 1), c″(4, 3), and b″(1, 5) no, a″c″b″ is located at a″(1, 1), c″(3, 4), and b″(5, 1)
Answers: 2
Mathematics, 21.06.2019 19:20
Aefg - almn. find the ratio of aefg to almn. a)1: 4 b)1: 2 c)2.1 d)4: 1
Answers: 1
Mathematics, 21.06.2019 19:20
Based on the diagram, match the trigonometric ratios with the corresponding ratios of the sides of the triangle. tiles : cosb sinb tanb sincposs matches: c/b b/a b/c c/a
Answers: 2
A project has four activities (A, B, C, and D) that must be performed sequentially. The probability...
English, 22.09.2020 15:01
Mathematics, 22.09.2020 15:01
Computers and Technology, 22.09.2020 15:01
Chemistry, 22.09.2020 15:01
Mathematics, 22.09.2020 15:01
Mathematics, 22.09.2020 15:01
Mathematics, 22.09.2020 15:01
Mathematics, 22.09.2020 15:01
Biology, 22.09.2020 15:01
Mathematics, 22.09.2020 15:01
Mathematics, 22.09.2020 15:01