5.11. A manufacturing process produces 500 parts per hour. A sample part is selected about every half hour, and after five parts are obtained, the average of these five measurements is plotted on an x control chart.
(a) Is this an appropriate sampling scheme if the assignable cause in the process results in an instantaneous upward shift in the mean that is of very short duration?
(b) If your answer is no, propose an alternative procedure. If your answer is yes, justify.
5.12.
Consider the sampling scheme proposed in Exercise 5.11. Is this scheme appropriate if the assignable cause results in a slow, prolonged upward drift in the mean? If your answer is no, propose an alternative procedure.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
If f(x)= 3x+6 which of the following is the inverse of f(x)
Answers: 2
question
Mathematics, 21.06.2019 18:30
Use δjkl and δmpn to determine whether don's claim is true or false. which of the following should don use to prove the triangles are similar? sss sas aas aa
Answers: 1
question
Mathematics, 21.06.2019 19:00
The ratio of the measures of the three angles in a triangle is 2: 9: 4. find the measures of the angels
Answers: 2
question
Mathematics, 21.06.2019 23:00
John has 1/2 pound of oranges to share with julie. if they share the oranges equally, how much will each of them have?
Answers: 1
You know the right answer?
5.11. A manufacturing process produces 500 parts per hour. A sample part is selected about every ha...
Questions
Questions on the website: 13722361