subject
Mathematics, 08.07.2021 20:40 sdavis1471

It takes 5 hr for 2 bricklayers to build a park wall. How long would it take 8 bricklayers to complete the job?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
W-16=-12 solve each one step equation plz
Answers: 2
question
Mathematics, 21.06.2019 22:30
How do you do the foil method with polynomials?
Answers: 1
question
Mathematics, 21.06.2019 23:10
Astudent draws two parabolas on graph paper. both parabolas cross the x-axis at (–4, 0) and (6, 0). the y-intercept of the first parabola is (0, –12). the y-intercept of the second parabola is (0, –24). what is the positive difference between the a values for the two functions that describe the parabolas? write your answer as a decimal rounded to the nearest tenth
Answers: 2
question
Mathematics, 22.06.2019 01:30
Talia took the bus from her home to the bank and then walked back to her home along the same route. the bus traveled at an average speed of 40 km/h and she walked at an average speed of 5 km/h. to determine the time, x, that it took talia to walk home, she used the equation 40(0.9 – x) = 5x. the time of trip 2 is hours. the distance of trip 1 is km.
Answers: 1
You know the right answer?
It takes 5 hr for 2 bricklayers to build a park wall. How long would it take 8 bricklayers to comple...
Questions
question
Biology, 24.04.2021 05:50
question
Mathematics, 24.04.2021 05:50
Questions on the website: 13722362