Mathematics, 12.07.2021 17:10 Jasten
Bob paid $152 to get his car repaired. The total cost for the repairs is the sum of the amount paid
for parts and the amount paid for labor. Bob was charged $56 for parts and $24 per hour for
labor. Construct and solve an equation to find the number of hours it took to repair the car. Show
all of your work and prove your answer to be correct.
Answers: 3
Mathematics, 21.06.2019 20:30
Write an equation of the line that passes through 9,2 and is parallel to the line y=5/3x+9
Answers: 1
Mathematics, 21.06.2019 20:30
Arectangle has a width of 5 cm and a length of 10 cm. if the width is increased by 3, how does the perimeter change?
Answers: 1
Mathematics, 21.06.2019 21:00
X+y=-4 x-y=2 use elimination with adding and subtraction
Answers: 3
Bob paid $152 to get his car repaired. The total cost for the repairs is the sum of the amount paid...
English, 09.10.2021 14:00
Chemistry, 09.10.2021 14:00
Computers and Technology, 09.10.2021 14:00
History, 09.10.2021 14:00
Mathematics, 09.10.2021 14:00
Computers and Technology, 09.10.2021 14:00
Spanish, 09.10.2021 14:00
Mathematics, 09.10.2021 14:00
Mathematics, 09.10.2021 14:00
Chemistry, 09.10.2021 14:00